Build Log
As part of the FAA certification process for an Experimental Amateur Built Aircraft, the builder has to be able to show that at least 51% of the build was done in person. With this section of the website I am going to document the progress toward completion of the Gyroplane. The build log is structured like the FAA checklist so that I can easily put the final documentation together. Each of the links below is structured to fit the required FAA build log format required for the Aircraft certification.